What you will likely and may not get from SDSR 2015

I never like rumours or hearsay but I guess it’s not harm jumping on the pre-Strategic Defence and Security Review (SDSR) 2015 bandwagon.

What will likely be mentioned (in terms of Strategy and Security):

Strategy:

* Government will mean 2% of Gross National Product/Income (GDP/GDNI) of spending on defence.
* Budget (for maybe just equipment) will rise to rise in real terms – 0.5% above inflation – every year during the Parliament (as stated previously in the July 2015 Budget statement )
* NATO will be the core alliance the UK will work with for eternity (or for the super long term), not the European Union (EU)
* Government will also mean the (oudated) Official Development Assistance aka foreign aid target of 0.7% of GDP.
* Focus will be on core areas such as the Middle East (Daesh/ISIS/ISIL), Africa (North and Central)
* Falklands Garrison will stay with no immediate change
* US will be the main strategic ally
* Lancaster House treaty will continue
* Focus will be on value for money–efficiency savings as MOD budget is not ringfenced–but value for strong output
*Linking to above, people such as the Reserves will play a core role in Future Force 2020

In terms of armed forces:

Royal Navy:

* 2 Queen Elizabeth-Class aircraft carriers will be built
* The Type 26 Global Combat Ship/frigate will be built
* 4 x Successor Ship, Submersible, Ballistic, Nuclear) (SSBNs) will be built to retain the UK’s strategic deterrent.
* 7 x Astute Ship Submersible Nuclear (SSN) Astute-Class boats
* 3 x River-Class Batch 2 Patrol Boats (likely to replace the older 3 Batch 1 boats)
* The Mine countermeasures and Hydrographic Capability (MHC) will be considered to replace current Mine-countermeasure vessels
* Merlin and Wildcat numbers will remain
* The Response Force Task Group (RFTG) annual COUGAR deployments will continue, with either Queen Elizabeth-Class carrier joining the RFTG post-2020.
* Unmanned aircraft, surface craft (USV) and undersea craft (UUV) will form the main R&D projects in the future Royal Navy

British Army:

* Army 2020 will continue with some unit changes and some units changing barracks. All units in Germany will return to the UK.
* Ajax (formerly SCOUT SV) production and numbers will continue and stay the same.
* Warrior upgrades aka Warrior Capability Sustainment Programme (CSP) will continue, except that only 245 of them will receive the CTA 40mm gun/cannon (see this article). That is, not all of the six Army 2020 armoured infantry vehicles will gain the new gun/cannon
* Money will be set aside for the Mechanised Infantry Vehicle (former Utility Vehicle, former FRES UV) and the Multi-Role Vehicle-Protected (MRV-P) programmes.
* 50 Apaches will be upgraded to the E version.

Royal Air Force:

* 20 new “Protector” Remotely-Piloted Air Systems (RPAS) will be acquired, a double of the existing number. Basically, updated version of the MQ-9 Reaper.
* F-35Bs will be purchased.
* Trance 1 (T1) Typhoons will be retained to create additional Typhoon Squadrons for UK Quick Reaction Alert (QRA). Tranche 2 and 3 aircraft will thus be free for air-to-ground operations (that is, Operation Shader) (see this link)
* Sentinel R1 aircraft will be replaced.
* Other Intelligence, surveillance, target acquisition, and reconnaissance (ISTAR) aircraft to be upgraded, except the E-3s.

Joint Forces:

* The range of UK Special Forces will gain new equipment.See this news article
* There will be a Multi-Mission Aircraft (MMA), not just a new Maritime Patrol aircraft. (see again this link
* Cyber defences will be strengthened, and the Joint Cyber Reserve will be a key part of this.
* The 77th Brigade (I put this under Joint since it consider of personnel from all services and civilians from other ministerial departments join it) will be a create part of soft power or mechanisms to stabilise or prevent conflict.

These are some of the top issues and assets you may get from SDSR 2015. What you MAY NOT GET or MOST LIKELY WON’T GET:

Strategy:

* Government will not have spare cash or large amount of spare cash to boost the Defence budget beyond 2% of GDP. It may gain funds from the Treasury Reserve, the Conflict Stability and Security Fund (CSSF). The MOD may not have enough money to contribute to the Deployed Military Activity Pool (DMAP), which is a contingency fund within the CSSF, used to support the UK’s emerging in-year security, diplomatic and aid priorities.
* The UK may not, and has not recently been, the second highly country with the largest number of deployed troops in NATO. This level will unlikely be an issue in SDSR 2015.
* The UK will have to depend largely on the US and France should it find itself in a Iraq (Gulf War I mean) or Afghanistan-style conflict. Daesh seems to creating one. SDSR 2015 may not throw in money or personnel into this.
* Personnel shortages may be addressed but not solved in the short or long-term. It would mean lots of equipment without people to operate. More below.
* Chasing targets like 2% and 0.7% would be lots of changing goalposts and a fixation on money not quality. No change in SDSR 2015 for sure.

In terms of armed forces:

Royal Navy:

* SDSR 2015 will not increase personnel strength so that both carriers will operate simultaneously. In fact, snippets indicate that only 450 more sailors will be added to the Royal Navy’s strength. It might mean that HMS Queen Elizabeth won’t operate at full strength, even minus air group. One carrier at all times will most definitely be in port aka extended readiness.
* There will be no definitely confirmation that 13 Type 26 frigates will be ordered. Mybe there could be, but in “drips and draps”.
* There might be, as there always has been, delays to the Astute SSNs boats coming into service. Same with the never to be used Successor SSBNs.
* HMS Ocean may not or never be replaced as a like-for-like. The Royal Navy will have to depend on an aircraft carrier as a strike carrier and a LPH.
* The Royal Fleet Auxiliary (RFA) eldery ships may not be replaced like-for-like.
* The Royal Navy may only end up with the 3 new River-Class Batch 2 ships and HMS Clyde with the Batch 1 ships decommissioned early.
* The MHC project may be delayed.
* Not change in the Merlin HM2/MK2 numbers, so not enough for ASAC and carrier-based ASW roles.
* 809 NAS may have more RAF pilots than Fleet Air Arm (FAA) pilots

British Army:

* No change to Army 2020 in terms of units and personnel. Big adverse implications for units and the Special Forces–see below.
* There may be some removal of 2*s aka Major-Generals or even 1*s Brgadiers who don’t command units. But the Army may still be top-heavy.
* Army Command will change–Deputy CGGS and Commander Personnel Support Command, but that means more money for top commanders not units.
* Challenger 2 will be updated but may not improved or replaced anytime soon unlike this report. So this report is more likely.
* MIV and MRV-P may not appear in the short term.
* No change in CTA turrets or guns/cannon numbers.

Royal Air Force:

* No large order of F-35B aircraft. The orders may likely be in “drips and draps”.
* AMRAAMs may be kept in the long term and there may not be larger numbers of Meteor missile produced or ordered.
* As noted above, there may not be upgrades for all UK ISTAR aircraft or C2 aircraft such as the E-3 which is critical for QRA an operations.
* RAF may end up with more aircraft and still not solving its manpower shortage. This might affect not just the manned aircraft but the 20 new Protectors.

Joint Forces:

* The MMA or at least MPA will not be the highly expensive yet operational P-8 Poseidon. The yet unknown aircraft may not appear in the short term (say 2-4 years) after it is announced.
* The Joint Cyber Reserve may not likely become a full cyber unit despite cyber threats being a Tier 1 threat as identity in the 2010 National Security Strategy (NSS).
* Special Forces will et their new equipment but with the shrunken Army 2020 and Future Force 2020, the various SF units may not be at full strength.

So there you have it folks!!! We wait the announcement around 1530 UK time 23 November 2015.